Police Training Facility

Police Training Facility

Description

A modern high-tech police training facility in Berkley. Topfix Interiors installed internal partitions including several bespoke umbrella details to allow for the deflection heads, suspended ceilings including specialist instal of perforated acoustic plasterboard on MF and mineral fibre tiles into grid, along with acoustic treatment to specific areas. Around the perimeter of first and second floor a bulkhead detail was installed. Finishing included tape & jointing in addition to plastering.

topfix styling
topfix styling

Location: Berkeley

Project duration: 26 Weeks

Project Type: Refurbishment

Summary of works

  • Drylining

  • Suspended ceilings

  • MF ceilings

  • Plastering

  • Tape and Joinery

  • Acoustic Wall panels

Products Used

  • Visqueen vapour barrier

  • GTEC metal sections

  • GTEC 9.5mm Standard Board

  • GTEC 12.5mm Standard Board

  • GTEC 12.5mm Fire Board

  • GTEC 15mm Standard Board

  • GTEC 15mm Fire Board

  • GTEC 15mm dB Board

  • GTEC 15mm Universal Board

  • GTEC 15mm Aqua Board

  • 15mm LaDura

  • Earthwool APR

  • Celotex

  • Plywood

  • Thistle Hardwall

  • Thistle Multifinish

  • GTEC Smartmix

  • GTEC Aqua mix

  • GTEC Joint filler Xtra

  • GTEC Joint cement Xtra

  • GTEC Universal sealer

  • GTEC fire rated silicone sealant

  • GTEC Intumescent sausage mastic

  • GTEC Socket pads

  • 600x600mm Rockfon Artic

  • 600x600mm Rockfon Koral

  • Rockfon Ceiling grid 

  • Rockfon Non corrosive ceiling grid

  • Black shadow batten

  • 1800x1200 Wallsorba B